From Fragmented Sites to Integrated Control: Achieving Cost Per Ton Visibility Across Four Mine Sites

21→7
DAYS TO MONTH-END CLOSE
18%
ASSET UPTIME IMPROVEMENT
4
MINE SITES INTEGRATED
100%
COST PER TON VISIBILITY

The Challenge

A leading nickel mining company operating four sites across Sulawesi had grown rapidly through a combination of organic expansion and acquisition. Each site had developed its own operational systems, reporting processes, and maintenance routines. By 2023, the company was producing significant tonnage across all four sites — but management had no unified view of what that tonnage was actually costing them.

Cost per ton — the company's primary profitability metric — was calculated monthly by the finance team from data manually compiled across four site-level spreadsheets, two accounting systems inherited from acquisitions, and a separate asset register maintained by the operations team. The process took 21 days from month-end to produce a reliable number. By the time management received it, 21 additional days of production had passed under the same conditions.

The CFO described the situation directly: "We were making operational decisions based on estimates we knew weren't accurate, because we didn't have anything better. When we finally got the actual numbers, it was too late to change what had already happened."

Three specific pain points drove the decision to seek a structural solution:

The Approach

Pratesis began with a structured operational assessment across all four sites — mapping data flows, identifying integration gaps, and establishing a baseline measurement of current cost per ton visibility latency. The assessment took four weeks and produced a blueprint that the executive team reviewed and approved before implementation began.

The implementation followed a four-phase approach over 14 months:

1
Foundation — Core Financial System
Deployed Pronto Xi ERP as the single financial management system across all four sites. Established a unified chart of accounts, cost centre structure, and budget governance framework. Data migration from the two legacy accounting systems completed in parallel.
2
Asset and Maintenance Integration
Configured the asset register across all equipment classes at all four sites. Implemented preventive maintenance scheduling — triggering work orders by time, usage, and condition rather than breakdown. All maintenance costs flow automatically to the relevant asset, cost centre, and site P&L.
3
Procurement Governance
Established a unified procurement process with PO approval workflows across all sites. Vendor master consolidated — reducing the vendor list from 340 entities to 180 approved suppliers. Goods receipt confirmation integrated with accounts payable, creating a complete procure-to-pay audit trail.
4
Intelligence Layer and People Enablement
Deployed operational dashboards configured for CEO, CFO, and COO — cost per ton by site, asset utilisation, maintenance cost trends, and procurement spend by category. Ran a structured People Enablement programme across all four sites — capability assessment, role-based training, and 6-month adoption monitoring.
"For the first time in the company's history, I can see cost per ton across all four sites before 9am on the first working day of the month. That's not a reporting improvement — it's a governance transformation."
CF
Chief Financial Officer
A leading nickel mining company, Sulawesi

The Outcomes

Fourteen months after the initial assessment, the company was operating with a genuinely integrated operational control system. The results were measurable and auditable:

MEASURED OUTCOMES — 12 MONTHS POST GO-LIVE
21→7
Days to month-end close
18%
Asset uptime improvement
100%
Cost per ton visibility, real-time
46%
Reduction in unplanned maintenance events
340→180
Vendor consolidation
3mo
To positive ROI on implementation

Beyond the metrics, the CFO described a qualitative shift that the numbers don't fully capture: the finance team now spends 70% of its time on analysis, forecasting, and governance — compared to 60% on reconciliation before. The COO described knowing, for the first time, which of the four sites was the most efficient operator — and why.

What This Means for Similar Operations

The pattern this company experienced — fragmented systems producing fragmented visibility — is not unusual in mining enterprises that have grown through acquisition or rapid expansion. The specific systems vary; the structural problem is consistent.

What this engagement demonstrated is that the solution is not primarily a technology problem. The technology exists. The challenge is the governance architecture — ensuring that every operational transaction, from a maintenance work order to a purchase receipt, flows into the same system, consistently, without manual intervention.

That requires three things working together: the right platform configured for mining-specific processes (not a generic ERP), a disciplined implementation that establishes clean data from day one, and a people programme that builds the organisational habit of operating with data rather than around it.

If you are operating a mining enterprise with similar characteristics — multiple sites, fragmented reporting, reactive maintenance, or constrained finance capacity — we'd encourage you to start with a conversation about your specific situation before assuming the solution you need.

Is your organisation facing similar challenges?
Start a conversation. We'll listen first — no pitch, no commitment — and tell you honestly whether and how we can help.
Start a conversation
PRATESIS © 2026 · INTEGRATING FORWARD THINKING